国产精品大屁股熟女白浆一区二区_国产露出调教视频在线观看_精品极品国产哟在线观看_国产又黄又爽又猛免费视频播放

Welcome to Jiaozuo Libo Light Alloy Co., Ltd.

Aluminum alloy sacrificial anode

magnesium anode, zinc anode

Telephone:

0391-7588881 +8618739187123

Jiaozuo Libo Light Alloy Co., Ltd.

Q & A

Why are pile foundation test piles designed differently from ordinary piles

  • Author:Libo
  • Source:wwww.bonusugetir.net
  • Date:2021-06-11
  • Click:0

If the reinforcement is different. Considering that the test pile should bear much more force than ordinary engineering pile (generally more than twice), in order to avoid the failure of the test due to the strength of the pile itself in the test process, the pile body is strengthened.

Online
聯(lián)系方式

熱線電話

18739187123

上班時間

周一到周五

公司電話

0391-7588881